شما هنوز به سایت وارد نشده اید.
یکشنبه 02 دی 1403
ورود به سایت
آمار سایت
بازدید امروز: 9,512
بازدید دیروز: 19,661
بازدید کل: 158,500,001
کاربران عضو: 1
کاربران مهمان: 80
کاربران حاضر: 81
نمایش مقالات انگلیسی با موضوع: تولید تعداد : 95
41. A multi-agent system using iterative bidding mechanism to enhance manufacturing agility
Source: Expert Systems with Applications 39 (2012) 8259–8273
Authors: .
No of Pages: 15
Price (Tomans): 0
Abstract | Download
42. A modified genetic algorithm for quay crane scheduling operations
Source: Expert Systems with Applications 39 (2012) 4213–4221
Authors: .
No of Pages: 9
Price (Tomans): 0
Abstract | Download
43. A hybrid genetic algorithm for multi-objective product plan selection problem with ASP and ALB
Source: Expert Systems with Applications 39 (2012) 5440–5450
Authors: .
No of Pages: 11
Price (Tomans): 0
Abstract | Download
44. A fuzzy-decision-tree approach for manufacturing technology selection exploiting experience-based information
Source: Expert Systems with Applications 40 (2013) 6412–6426
Authors: .
No of Pages: 15
Price (Tomans): 0
Abstract | Download
45. A data mining approach considering missing values for the optimization of semiconductor-manufacturing processes
Source: Expert Systems with Applications 39 (2012) 2590–2596
Authors: .
No of Pages: 7
Price (Tomans): 0
Abstract | Download
46. Ergodic distribution for a fuzzy inventory model of type (s,S) with gamma distributed demands
Source: Expert Systems with Applications 40 (2013) 958–963
Authors: .
No of Pages: 6
Price (Tomans): 0
Abstract | Download
47. New VNS heuristic for total flowtime flowshop scheduling problem
Source: Expert Systems with Applications 39 (2012) 8149–8161
Authors: .
No of Pages: 13
Price (Tomans): 0
Abstract | Download
48. Modeling and solving a variant of the mixed-model sequencing problem with work overload minimisation and regularity constraints. An application in Nissan’s Barcelona Plant
Source: Expert Systems with Applications 39 (2012) 11001–11010
Authors: .
No of Pages: 10
Price (Tomans): 0
Abstract | Download
49. Sequence-dependent group scheduling problem on unrelated-parallel machines
Source: Expert Systems with Applications 39 (2012) 9021–9030
Authors: .
No of Pages: 10
Price (Tomans): 0
Abstract | Download
50. An improved solution to replenishment lot size problem with discontinuous issuing policy and rework, and the multi-delivery policy into economic production lot size problem with partial rework
Source: Expert Systems with Applications 39 (2012) 13540–13546
Authors: .
No of Pages: 7
Price (Tomans): 0
Abstract | Download
اول 2 3 4 5 6 7 8
کرمانشاه گشت - اولین سامانه جامع گردشگری استان کرمانشاه