شما هنوز به سایت وارد نشده اید.
پنجشنبه 01 آذر 1403
ورود به سایت
آمار سایت
بازدید امروز: 19,105
بازدید دیروز: 20,937
بازدید کل: 157,591,535
کاربران عضو: 0
کاربران مهمان: 122
کاربران حاضر: 122
Handling project dependencies in portfolio management
Abstract:

Although construction is a project-based industry, management focus has recently shifted from projects to project portfolios to meet strategic objectives of companies that require holistic analysis of the projects undertaken. Dependencies between projects within a portfolio need to be taken into consideration since they may significantly affect the portfolio success with their combined effects. There are limited studies in the area of construction project portfolio management that investigate how the dependencies between projects can be handled. In this paper, a method is presented to calculate and visualize project dependencies to support decision making process within a portfolio management tool for construction projects. Within this context, a dependency map is proposed not only to identify different dependencies and their effects within the portfolio, but also to take into consideration the combined effect of dependencies. An illustrative case study is depicted in the paper to demonstrate how the proposed method works and how its results can be used to support decision-making during portfolio selection.

Keywords: decision support system , DSS , network analysis , portfolio management , project dependencies , visualization
Author(s): GozdeBilginaGorkemEkenaBesteOzyurtaIremDikmenaM. TalatBirgonulaBelizOzorhonb
Source: Procedia Computer Science 121 (2017) 356–363
Subject: مدیریت پروژه
Category: مقالات ترجمه شده - دانلود ترجمه مقاله
Release Date: 2017
No of Pages: 8
Price(Tomans): 0
بر اساس شرایط و ضوابط ارسال مقاله در سایت مدیر، این مطلب توسط یکی از نویسندگان ارسال گردیده است. در صورت مشاهده هرگونه تخلف، با تکمیل فرم گزارش تخلف حقوق مؤلفین مراتب را جهت پیگیری اطلاع دهید.
 ترجمه این مقاله موجود است.
مشاهده ترجمه مقاله