شما هنوز به سایت وارد نشده اید.
پنجشنبه 20 دی 1403
ورود به سایت
آمار سایت
بازدید امروز: 37,580
بازدید دیروز: 35,469
بازدید کل: 158,937,487
کاربران عضو: 1
کاربران مهمان: 152
کاربران حاضر: 153
MRA-based revised CBR model for cost prediction in the early stage of construction projects
Abstract:

Accurate prediction of construction cost in the initial phase of a construction project is critical to the success of the project. Accordingly, many researchers have proposed various methodologies for predicting the cost in the initial phase with the use of limited information. This study was aimed at improving the prediction performance of a cost prediction model based on the Case-Based Reasoning (CBR) technique, which has recently become widely used. Toward this end, an improved CBR model that uses the Multiple Regression Analysis (MRA) technique in the revision phase of the CBR technique was developed. To verify the prediction performance of the proposed model, a case study was performed on 41 business facilities and 99 multi-family housing projects. The results showed that the prediction performance of the revised CBR model for business facilities and multi-family housings improved by 17.23% and 4.39%, respectively, compared to that of the existing CBR model. The proposed MRA-based revised CBR model is expected to be useful in estimating the construction cost in the initial phase of a projec

Keywords: Case-Based Reasoning Multiple Regression Analysis Cost prediction
Author(s): .
Source: Expert Systems with Applications 39 (2012) 5214–5222
Subject: مدیریت پروژه
Category: مقاله مجله
Release Date: 2012
No of Pages: 9
Price(Tomans): 0
بر اساس شرایط و ضوابط ارسال مقاله در سایت مدیر، این مطلب توسط یکی از نویسندگان ارسال گردیده است. در صورت مشاهده هرگونه تخلف، با تکمیل فرم گزارش تخلف حقوق مؤلفین مراتب را جهت پیگیری اطلاع دهید.
 

کرمانشاه گشت - اولین سامانه جامع گردشگری استان کرمانشاه